Dry Utility Consulting for Virginia, Maryland & Washington, D.C.

Mixed Use Building in Washington, DC

Mixed Use Project | Washington, DC

Overhead-to-underground conversion, new mainline and temporary services, demolition disconnects and streetlight coordination with PEPCO, Verizon, Comcast and Washington Gas for a mixed use building in the District.

Scope of Work

Utility Relocation

Overhead pole line conversion to underground. Coordinated with Comcast and Verizon to relocate existing overhead facilities underground while maintaining existing services to the residences that remain.

Mainline Services

  • Coordinated with PEPCO, Verizon, Comcast and Washington Gas for the service designs and easements required.
  • Completed PEPCO Structural Facility Drawings.
  • Completed layouts, including conduit and device locations, for each utility to follow while completing their respective designs.

Temporary Services

  • Coordinated with PEPCO to obtain a design and cost to provide temporary services for construction.
  • Completed PEPCO Structural Facility Drawings.

Disconnects

Coordinated with the PEPCO, Verizon, Comcast and Washington Gas construction departments to remove existing services and clear the way for demolition of the existing buildings.

Streetlights

Coordinated with PEPCO and the project MEP on the streetlight design and PEPCO source locations.

Project Snapshot

Category
Mixed Use
Location
Washington, DC
Utilities Coordinated
  • PEPCO
  • Verizon
  • Comcast
  • Washington Gas
Discuss a Similar Project

or call (571) 334-8717

Keep Exploring

More Mixed Use Projects

We Have All the Right Tools. Let Us Help You.

Tell us about your site and we will map out the power, telecommunications and natural gas coordination it needs, from feasibility through final installation.

Contact Us Call (571) 334-8717
Scroll